725th SMS B

 

TITAN I

451st STRATEGIC MISSILE WING

725th STRATEGIC MISSILE SQUADRON

LOWRY  AFB

DENVER, COLORADO  

PRESENT DAY PHOTOS

SITE 2B

 

ACCESS ROAD TO SITE

NOTEELECTRICAL POWER LINES INSTALLED AFTER DEACTIVATION

 

UHF  ANTENNA

 

ENTRANCE

NOTERECTANGULAR HATCH ADDED DURING OPERATIONAL PERIOD

 

PARKING AREA ADJACENT TO ENTRANCE PORTAL

NOTEPRIMARY AND SECONDARY ESCAPE HATCHES IN BACKGROUND

 

ORIENTATION TARGETS FOR GUIDANCE SYSTEM IN BACKGROUND

NOTEEDGE OF ENTRANCE HATCH TO THE LEFT

 

SETTLING AROUND ENTRANCE PORTAL

 

LAUNCHER 1 IN THE BACKGROUND

 

OVER LOOKING ENTRANCE PORTAL AND AIR INTAKE SHAFT TO POWERHOUSE

 

PRIMARY ESCAPE TUNNEL

 

INTERIOR VIEW OF PRIMARY ESCAPE TUNNEL

 

SECONDARY ESCAPE TUNNEL

 

AIR INTAKE SHAFT

 

ANTENNA SILOS

 

HARDENED HIGH FREQUENCY ANTENNA

NOTEORIENTATION TARGET IN BACKGROUND

 

POWERHOUSE EXHAUST

NOTEOPEN AREA IS WHERE ONCE WAS A FUEL TANK

 

FUEL TANK

 

 

ENTRY HATCH

NOTEADDED DURING OPERATIONAL PHASE TO ALL LOWRY

 

DOORWAY FROM NEW ENTRANCE HATCH AREA TO OLD ENTRANCE HATCH AREA

NOTESTRESS CRACK FROM

 

ORIGINAL ENTRANCE HATCH

NOTECIRCULAR STAIRS HAVE BEEN REMOVED

 

ENTERING STAIRWAY WHICH WRAPS AROUND ELEVATOR SHAFT

 

LOOKING DOWN ENTRY PORTAL SILO FROM WALKWAY

NOTEVISIBLE WATER IN PORTAL SILO SUMP

 

LOOKING UP ELEVATOR SHAFT

 

CONTINUING DOWN WALKWAY

 

ELEVATOR MOTOR STILL INTACT

 

LOOKING UP ELEVATOR SHAFT TO ENTRANCE PORTAL SILO DOORS

 

ENTRANCE TO TUNNEL JUNCTION

 

CLOSE UP VIEW OF DOOR FROM ENTRY PORTAL TO TUNNEL JUNCTION

 

LOOKING TOWARD POWER HOUSE

 

STORAGE TANK

 

UTILITY TUNNEL TO BLAST LOCKS AND LAUNCHERS

 

ANTENNA SILO TUNNEL

 

VIEW INTO LAUNCH OPERATIONS

 

LOWER LEVEL LAUNCH OPERATIONS

 

LOWER LEVEL LAUNCH OPERATIONS

 

PROCESS PIPING LAUNCH CONTROL CENTER

 

THIS TOILET HAS SEEN BETTER DAYS

 

SHOCK MOUNTED LIGHTS

 

ACOUSTICAL BAFFLING

 

LAUNCH OPERATION CONSOLES

 

MORE OPERATIONAL CABINETS

 

WHAT'S LEFT OF SOME LOGIC PANELS

 

LOGIC PANEL

 

AIR EXHAUST TUNNEL TO POWERHOUSE

 

MEZZANINE LEVEL OF POWERHOUSE

 

SHOCK MOUNTING FOR DIESEL GENERATORS

 

ALL THAT REMAINS OF THE POWERHOUSE

 

UTILITY TUNNEL TO BLAST LOCK

 

BLAST LOCK

NOTEPRIMARY ESCAPE HATCH IS OPEN

 

ENTRANCE TO UTILITY TUNNEL TO LAUNCHER NUMBER 1

 

BLAST DOOR

 

BLAST DOOR TO SILO, EQUIPMENT AND PROPELLANT TERMINAL

 

ENTRANCE TO SILO

 

ENTRANCE TO PROPELLANT TERMINAL

 

PROPELLANT TERMINAL

NOTENITROGEN TANKS MISSING

 

PLATFORM

NOTEBEHIND DOORWAY WAS THE LIQUID OXYGEN STORAGE TANK

 

PROPELLANT TERMINAL SHAFT OPENING

 

DOORWAY TO LAUNCHER

 

LAUNCHER

NOTEOPENING ON LEFT LEADS TO THE PROPELLANT TERMINAL

 

LAUNCHER

 

UPPER LEVEL OF LAUNCHER

NOTEWALKWAY BELOW SILO DOORS

 

LAUNCHER FUEL CRIB PARTIALLY INTACT

NOTETUNNEL ON RIGHT LEADS TO EQUIPMENT TERMINAL

 

SILO DOORS

 

LAUNCHER

NOTEWATER LEVEL IN BOTTOM OF SILO

 

FUEL CRIB

NOTEDUCT WORK STILL REMAINING

 

SHAFT OPENING FOR PROPELLANT TERMINAL

 

UPPER AREA OF LAUNCHER

 

MUCH OF THE VENTILATION AND WIRING STILL REMAIN

 

VIEW FROM EQUIPMENT TERMINAL TUNNEL

 

ENTRANCE TO EQUIPMENT TERMINAL

 

EQUIPMENT TERMINAL

NOTEEXTENSIVE VENTILATION AND PROCESS PIPING STILL REMAINS

 

MASSIVE AMOUNTS OF WIRING

 

TUNNEL LEADING FROM EQUIPMENT TERMINAL TO LAUNCHER

NOTEFUEL LINES THAT CARRIED RP-1  A FINE GRADE OF KEROSENE AS THE MISSILES PROPELLANT

 

THIS SMALL DOORWAY LEADS TO THE LAUNCHER

 

LAUNCHER IN BACKGROUND

 

PROCESS PIPING AND VENTILATION EQUIPMENT NEAR FUEL CRIB

 

FUEL CRIB IN BACKGROUND

 

 

HOME ] UP ] 725th SMS  A ] 725th SMS B ] 725th SMS  C ]

 

 

Copyrighted ©  1996-2007   The Housing Group, Inc.   All Rights Reserved.