|
PRIMARY SECURITY PIT WITH A-CKT VAULT DOOR INSTALLED NOTE: THIS IS THE FIRST LINE BARRIER TO KEEP INTRUDERS OUT OF THE UNMANNED LAUNCH FACILITIES. UNLOCKING THIS PLUG ALLOWS MAINTENANCE TEAMS TO OPEN THE 8 TON PERSONNEL ACCESS HATCH DOOR. AFTER THE PAH DOOR IS UNLOCKED A SECOND BARRIER MUST THEN BE UNLOCKED TO GAIN ACCESS TO THE LAUNCHER EQUIPMENT ROOM'S.
STATIC DISPLAY OF A PEACEKEEPER ARMORED VEHICLE NOTE: USED BY SECURITY POLICE DURING HIGH VALUE CONVOYS AND GUARDING OPEN LAUNCH FACILITIES
TOPSIDE OF LAUNCH FACILITY NOTE: ON THE RIGHT IS A RE-ENTRY VEHICLE G & C VAN POSITIONED OVER THE LC AS IT WOULD BE TO REPLACE AN R/V OR G & C TALL POLE IN CENTER IS THE NEW OUTER ZONE SECURITY RADAR ANTENNA ON THE LEFT IS THE TRAINER'S UNIQUE ENTRY STAIRS TO THE LAUNCHER EQUIPMENT ROOM IN
THE DISTANCE FAR LEFT IS THE DOME SHAPED PRIDE HANGAR, THE FORMER HOME OF THE
44th SMW OPERATIONS
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |