|
MISSILE SILO SITE 4
ELEVATOR ACCESS TO MISSILE ENCLOSURE AREA
SPIRAL STAIRS
SPIRAL STAIRS END ON LEVEL 7 AND LADDER BEGINS
THIS AREA HELD THE SECOND DIESEL GENERATORS
CRIB CONSTRUCTION NOTE: BEHIND THIS AREA ONCE STOOD THE LAUNCH PLATFORM COUNTERWEIGHTS
MORE CABLE TRAYS AND OUR ONLY WAY DOWN TO LEVEL 8
SOME OF THE CONNECTORS FOR THE PROPELLANT LOADING SYSTEM
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |