|
CLOSE UP OF THE WELL HOUSE AND WATER TREATMENT BUILDING PAD NOTE: THE 4 INCH RUBBER LINE IN THE BACKGROUND
WATER STORAGE AREA
ONE OF TWO WELLS NOTE: THIS WELL IS BEING USED TO PUMP WATER SEVEN MILES TO A POND THAT IS PROVIDING WATER FOR THE NEW HIGHWAY CONSTRUCTION
FENCING USED AROUND THE WATER TREATMENT FACILITY
EVAPORATION PONDS
SALVAGED MATERIAL STILL REMAINS AROUND THE SITE NOTE: DRAINAGE CULVERT IN BACKGROUND
DRAINAGE CULVERT FOR THE SITE
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |