|
ELECTRICAL AND MECHANICAL SHOPS
CLASSROOMS
CLASSROOMS
SCHEDULING AND PLANNING
CLASSROOMS/MAINTENANCE SECTION
THIS VAULT ORIGINALLY HELD BOMB SIGHTS
LOOKING BACK ON THE CLASSROOMS/OFFICES
CABLEWAYS FILLED IN WITH CEMENT
MORE CABLEWAYS FOR MISSILE CHECKOUT
THESE PADS ONCE HELD THE LARGE STEEL I-BEAMS OF THE MISSILE BAY AND CRANE NOTE: THE 13TH MISSILE WAS SUSPENDED FROM THESE BEAMS
FILLED IN CABLEWAYS
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |