|
|
|
DRILLING FOR MASS EXCAVATION OF CONTROL CENTER AREA COMPLEX 1A 3 MAY 1960
FOUNDATION PREPARATION FOR CONTROL CENTER
PREPARING TO BLAST TUNNEL TO LAUNCHER NUMBER 2 COMPLEX 1A 3 MAY 1960
MASS EXCAVATION ANTENNA SILOS COMPLEX 1A 1 JUNE 1960
MASS EXCAVATION POWERHOUSE AREA COMPLEX 1A 24 MAY 1960
|
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |