|
|
|
BACKFILLING ENTRANCE PORTAL SILO AREA COMPLEX 1A 28 AUGUST 1961
OPENING DOOR TO MISSILE SILO COMPLEX 1C 16 SEPTEMBER 1961
MISSILE SILO WITH DOORS OPEN COMPLEX 1C 27 SEPTEMBER 1961
LOOKING WEST FROM BLAST LOCK NUMBER 2 COMPLEX 1C 17 JANUARY 1962
PIPE SUPPORTS IN "A" TUNNEL EQUIPMENT TERMINAL NUMBER 2 COMPLEX 1A 9 FEBRUARY 1962
COOLING TOWER IN POWERHOUSE COMPLEX 1A 13 DECEMBER 1961
CONDENSER WATER PUMPS IN POWERHOUSE COMPLEX 1B 13 FEBRUARY 1962
LOOKING SOUTHWEST OVER POWERHOUSE FROM MEZZANINE LEVEL
|
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |