EXCAVATION OF THE FIRST TITAN I SITE

 

T1con-1a.JPG (239077 bytes)

CONSTRUCTION BEGINS

 

T1con-1b.JPG (254547 bytes)

SILO EXCAVATION

 

T1con-1c.JPG (227276 bytes)

A FORM BEING LOWERED INTO SILO

 

T1con-1d.JPG (254128 bytes)

NOTICE TEMPORARY SCAFFOLDING AND STAIRWAY

 

T1con-1e.JPG (232943 bytes)

EXTERIOR FORMS AND STEEL END BRACING

 

T1con-1f.JPG (240530 bytes)

READY FOR CEMENT

 

T1con-1g.JPG (220534 bytes)

TO BUILD 3 OF THE COMPLEXES IT REQUIRED 100,000 CUBIC YARDS OR 202,500 TONS OF CONCRETE

 

T1con-1h.JPG (237975 bytes)

PROPELLANT TERMINAL, MISSILE SILO AND EQUIPMENT, BEFORE FINAL BACKFILL AND COMPACTING

 

T1con-1i.JPG (198450 bytes)

BACKFILLING

 

T1con-1j.JPG (251082 bytes)

POWER HOUSE SCAFFOLDING

 

T1con-1k.JPG (157327 bytes)

INTERIOR PHOTO SHOWING SCAFFOLDING FOR POWER HOUSE

 

T1con-1l.JPG (239493 bytes)

GUNITE BEING SPRAYED OVER POWER HOUSE

 

T1con-2a.JPG (275468 bytes)

OVER 1200 MILES OF REINFORCED STEEL WAS USED IN CONSTRUCTING 3 OF THE SITES

 

T1con-2b.JPG (225645 bytes)

POWER HOUSE SHOWING SOME OF THE GENERATORS AND MECHANICAL EQUIPMENT NECESSARY TO RUN THE COMPLEX

 

T1con-2c.JPG (256265 bytes)

EACH OF THE 4 GENERATORS WAS CAPABLE OF PRODUCING 1163 KILOWATTS

 

T1con-2d.JPG (259894 bytes)

LOCATED NEXT TO THE ENTRANCE PORTAL WAS THE WIND VELOCITY AND RADIATION SENSING AND MEASURING EQUIPMENT.

 

T1con-2e.JPG (220206 bytes)

EARTH AUGER DRILLING AN EXHAUST AIR DUCT HOLE NEAR LAUNCHER #2

 

T1con-2g.JPG (209901 bytes)

THE ENTRANCE PORTAL WITH TWO 30,000 GALLON WATER TANKS

 

T1con-2h.JPG (239023 bytes)

COMPACTING AND BACKFILLING AROUND POWER HOUSE

 

T1con-2i.JPG (203770 bytes)

ENTRANCE PORTAL AND POWER HOUSE.  EACH COMPLEX HAD TWO 33,500 GALLON DIESEL STORAGE TANKS

 

T1con-2j.JPG (185604 bytes)

LIQUID OXYGEN STORAGE TANK.  EACH PROPELLANT TERMINAL HAD ONE OF THESE 26,000 TANKS

 

T1con-2k.JPG (189228 bytes)

THESE CABLE TRAYS IN THE UTILITY TUNNELS CONTAIN MORE THAN 300 MILES OF WIRE USED IN 3 OF THE COMPLEXES

 