|
|
|
WRAPPING ROOM CLEAN PIPE IS PROTECTED WITH POLYETHYLENE GASKETS AND STEEL FLANGES FOR SHIPMENT TO THE FIELD
DRYING ROOM FOR BLACK PIPE WORKMAN DRYING FLEXIBLE HOSE WITH SUPPLY OF CLEAN HOT FILTERED NITROGEN GAS
PROPELLANT LOADING SYSTEM INSTALLATION IN THE PROPELLANT TERMINAL SHOWING SUPPORT SYSTEM FOR VENT LINES ON UPPER FLOOR
WELDING PIPE SUPPORTS IN PROPELLANT TERMINAL ON LOWER FLOOR
PROPELLANT LOADING SYSTEM INSTALLATION ON LOWER FLOOR SHOWING HORIZONTAL SHOCK SPRINGS BETWEEN PROPELLANT TERMINAL WALL AND SHOCK MOUNTED COLUMN. SPRING ISOLATED AIR EXHAUST BLOWER IN RIGHT FOREGROUND
PROPELLANT LOADING SYSTEM PIPING ON LOWER LEVEL FLOOR OF PROPELLANT TERMINAL LEADING INTO LOX TUNNEL. 8 INCH LOX LOADING LINE AT BOTTOM. INSULATED TOPPING LINES ABOVE.
8 INCH LOX LOADING FLOW CONTROL VALVE DURING LIQUID NITROGEN COLD FLOW TESTING. UPPER FLOOR OF PROPELLANT TERMINAL.
8 INCH LOX LINE UNDER COLD FLOW TEST AT ENTRANCE TO LOX TUNNEL. NOTE: GIMBLE JOINTS AND CIRCULAR ALUMINUM AIR EXHAUST DUCT
|
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |