FORMING FOR POUR #9 AND PLACING OF REINFORCING STEEL FOR TYPICAL MISSILE SILOS SHOWING THE SILOS AT POINT OF FLARING OUT APPROXIMATELY 30 FEET DOWN FROM FINISH ELEVATION.
SCAFFOLDING FOR POWERHOUSE DOME CONSTRUCTION. FORMS HAVE BEEN REMOVED FROM LOWER LIFT AND PLACEMENT OF FORMS FOR REMAINDER OF DOME IS INCOMPLETE IN THIS VIEW.
REINFORCING STEEL AND FORMING IN PLACE FOR UPPER DOME AREA FOR POWERHOUSE OR CONTROL CENTER
WATERPROOFING BEING PLACED ON CONTROL CENTER DOME. MOST MATERIALS AND EQUIPMENT FOR INTERIORS TO BE BROUGHT IN THROUGH TUNNEL WHICH CONNECTS TO OPENING ON FLOOR SIDE.
PREFABRICATED TUNNEL JUNCTION BEING TRANSPORTED TO A COMPLEX CONSTRUCTION SITE FOR PLACEMENT AND BACKFILLING.
PLACING AND ALIGNING OF PREFABRICATED PERSONNEL TUNNEL JUNCTION SECTIONS PRIOR TO BACKFILL OPERATIONS. OPEN CUT EXCAVATION OPTION ELECTED BY CONTRACTOR FOR CONSTRUCTION OF TUNNELS.
VIEW OF PRESTRESSING MACHINE WRAPPING #18 WIRE AROUND BASE OF POWERHOUSE PRIOR TO BACKFILL
VIEW OF REINFORCING STEEL PLACED PRIOR TO #12 MISSILE SILO POUR. TOPPING OUT OF MISSILE SILO
|
|
Copyrighted © 1996-2007 The Housing Group, Inc. All Rights Reserved. |