ELECTRICAL CONDUIT INSTALLATION IN A MISSILE SILO.  THIS INSTALLATION IS FOLLOWED BY THE PROPELLANT LOADING SYSTEM, FUEL PIPING, AIR CONDITIONING AND ELEVATOR.

 

PIPING AND CABLE TRAYS IN TUNNEL RUN BETWEEN ANTENNA TERMINAL AND POWERHOUSE / CONTROL CENTER AREA

 

SPRINGS IN PLACE FOR SHOCK MOUNTING OF FLOOR BEAMS IN PROPELLANT TERMINAL

 

BLAST LOCK NUMBER 1 BEING PLACED.

NOTE:  FORMING FOR BLAST LOCK NUMBER 2 IN BACKGROUND

 

AIR FILTRATION STRUCTURE UNDER CONSTRUCTION.  TUNNEL JUNCTION PLACED AT POWERHOUSE AND CONTROL CENTER ACCESS PORTAL SILO UNDER CONSTRUCTION

 

ANTENNA SILO DOORS INSTALLED AND TIED OPEN.  FINISH GRADE WILL BE TOP OF CONCRETE FOR SILO

 

ACCESS PORTAL SILO UNDER CONSTRUCTION PRIOR TO BACKFILL.

NOTE:  TUNNELS AND FUEL TANKS IN PLACE

 

INSTALLING HIGH PRESSURE NITROGEN TANKS IN THE PROPELLANT TERMINAL

 

 

 

 