FUEL CRIB IN MISSILE SILO

RP-1 FLOW CONTROLLER AND AIR RELEASE TANK INSTALLATION

 

TUNNEL JUNCTION 12

FUEL TRANSFER PANEL

 

TUNNEL JUNCTION 12

FUEL CONTROL VALVES AND PIPING INSTALLATION

 

INTERCONNECTING TUNNEL  NOTICE FIELD INSTALLATION SET-UP

 

COMPLETED INTERCONNECTING TUNNEL INSTALLATION

 

PROPELLANT TERMINAL

MAIN DECK PIPING INSTALLATION FOR LOX TANK SAFETY VALVE MANIFOLD

 

PROPELLANT TERMINAL

MAIN DECK VALVES AND CONNECTIONS TAPED FOR LEAK CHECK DURING TESTING

 

 